• Home
  • All News
  • About Us
  • Contact Us
  • Submit an article
We Are South Devon
Advertisement
  • Home
  • All News
  • About Us
  • Contact Us
  • Submit an article
No Result
View All Result
  • Home
  • All News
  • About Us
  • Contact Us
  • Submit an article
No Result
View All Result
We Are South Devon
No Result
View All Result
  • Home
  • All News
  • About Us
  • Contact Us
  • Submit an article

Oldway Road partial lane closure

WASD by WASD
November 5, 2020
in Community News
Oldway Road partial lane closure

A lane closure is currently in place affecting Oldway Road at the rear of Oldway Mansion. The section of Oldway Road where the lane closure is in operation is adjacent to the Carriage Rooms and the old Squash Court buildings, which form part of the Oldway Mansion Estate.

The lane closure is necessary to protect the public from the risk of failure from the walls and masonry associated with these buildings. Urgent investigations are being carried out to assess the extent of the weathering damage to these buildings. Of particular concern is the condition of the high perimeter walls at this location. This includes the old Squash Courts, the East and West Towers and the Carriage Room.

RelatedPosts

Nurses Evelina and Juna champion the importance of their profession

Hundreds back campaign to save Paignton Ambulance Station

Torquay’s 170 Pubs & Clubs

Heras fencing has been installed along the length of the perimeter wall on the highway for public safety reasons and also enables ongoing investigations to take place safely. The fencing narrows the highway to one lane and two way traffic lights are in operation until further notice. Vehicle and pedestrian access to Oldway Mansion from Oldway Road is not affected.

The investigations being carried out involve officers from Torbay Council’s Planning and Building Control teams, Torbay Development Agency structural engineers and a local Heritage Architect Consultancy. The aim is to establish a suitable course of action and identify any works which are required.

Councillor Mike Morey, Cabinet Member for Infrastructure, Environment and Culture for Torbay Council, said: “These works are necessary and need to be urgently carried out. The work will be completed as quickly as possible to minimise any disruption.”

As investigation work is ongoing, it is not possible at this stage to confirm an end date for the lane closure that is currently in place.

You can join us on our social media pages, follow us on Facebook or Twitter and keep up to date with whats going on in South Devon.

Got a news story, blog or press release that you’d like to share or want to advertise with us? Contact us

Related Posts

Nurses Evelina and Juna champion the importance of their profession
Community News

Nurses Evelina and Juna champion the importance of their profession

May 12, 2025
Community News

Hundreds back campaign to save Paignton Ambulance Station

May 12, 2025
Torquay’s 170 Pubs & Clubs
Community News

Torquay’s 170 Pubs & Clubs

May 12, 2025
The Devil and his Dogs at Daddyhole
Community News

The Devil and his Dogs at Daddyhole

May 11, 2025
Over 800 clubs signed up to get 20,000 people playing bowls across the nation
Community News

Over 800 clubs signed up to get 20,000 people playing bowls across the nation

May 9, 2025
Community News

Transformation of Paignton Picture House Begins, backed by Torbay Council

May 9, 2025
  • Home
  • All News
  • About Us
  • Contact Us
  • Submit an article

© 2023 We Are South Devon Brought to you by Griffiths Networking

No Result
View All Result
  • Home
  • All News
  • About Us
  • Contact Us
  • Submit an article

© 2023 We Are South Devon Brought to you by Griffiths Networking